LOLER Thorough Examination Report template
Records the information LOLER Schedule 1 requires for a thorough examination of lifting equipment, including defects and next due date.
Opens in a free trial with this form ready to use.
Download printable PDF (62 KB)LOLER 1998 (reg. 9 and Schedule 1)
This template is provided as a starting point only. pro-Forms accepts no liability for the accuracy or suitability of its forms. Check every form with a suitably qualified person before using it in a live environment.
About this template
A report of a thorough examination of lifting equipment, covering the information LOLER Schedule 1 requires: the owner and premises, the equipment's make, model, serial number and safe working load, the date of the last examination, the reason for this one and whether it is safe to operate.
Record any defects that are, or could become, a danger, the repairs needed and the date by which they must be done, tests carried out and the next examination date. The examiner adds their qualifications and signs.
What's on this form
Every field in the template, grouped as it appears on the phone. Required fields are marked *.
1. Equipment
- Employer / owner name * Text
- Address of premises * Paragraph
- Equipment make Text
- Equipment model Text
- Equipment serial number Text
- Equipment ID / barcode Barcode scan
- Equipment location Text
- Safe working load * Text
- Date of manufacture Date
- Date of last thorough examination Date
2. Examination
- Reason for examination * Within 6-month interval / Within 12-month interval / In accordance with examination scheme / After exceptional circumstances / Before first use Choice
- Is the equipment safe to operate? * Yes / No Choice
- Defects that are, or could become, a danger * Paragraph
- Repair / renewal / alteration required Paragraph
- Date by which defect must be rectified Date
- Tests carried out Paragraph
- Next thorough examination due * Date
- Photo 1 Photo
- Photo 2 Photo
3. Examiner
- Examiner name * Text
- Examiner qualifications / employer Text
- Date of examination * Date
- Examiner signature * Signature
Questions about this template
How often is a thorough examination needed?
At least every 12 months for lifting equipment, every 6 months for equipment that lifts people and for lifting accessories, or at the intervals in a written scheme of examination.
Who can carry out a thorough examination?
A competent person with the technical knowledge and experience to detect defects, and independent enough to make an objective judgement. It is often a specialist engineer from an insurer or inspection body.
What if a serious defect is found?
The examiner must tell the employer straight away and, where there is an existing or imminent risk of serious injury, send a copy of the report to the enforcing authority.
