Planned Maintenance (PPM) Task Sheet mobile form preview
Facilities ManagementManufacturingPrefabricated Data Centres Mobile form 3 sections · 27 questions Free

Planned Maintenance (PPM) Task Sheet template

Generic planned preventive maintenance task sheet: asset, frequency, task steps, readings, condition and follow-on work.

Use this template free

Opens in a free trial with this form ready to use.

Download printable PDF (69 KB)
Relates to

SFG20 schedules (where applicable)

This template is provided as a starting point only. pro-Forms accepts no liability for the accuracy or suitability of its forms. Check every form with a suitably qualified person before using it in a live environment.

About this template

A general planned preventive maintenance task sheet for any asset. Record the asset, the frequency and the task or schedule reference, then add each task step with its result, reading and notes.

Finish with the asset's condition and any follow-on work found, with photos. It suits SFG20-based schedules as well as your own maintenance routines.

Recording readings such as currents, pressures and temperatures on every visit builds a history for the asset, so gradual deterioration is spotted before it becomes a breakdown.

What's on this form

Every field in the template, grouped as it appears on the phone. Required fields are marked *.

1. Task

  • Customer name * Text
  • Site name Text
  • Site address Paragraph
  • Job reference Text
  • Date of visit * Date
  • Time on site Time
  • Time off site Time
  • Asset make Text
  • Asset model Text
  • Asset serial number Text
  • Asset ID / barcode Barcode scan
  • Asset location Text
  • Frequency * Weekly / Monthly / Quarterly / 6-monthly / Annual Choice
  • Task / schedule reference Text

2. Task steps repeats as needed

  • Task step * Text
  • Result * Done / Not done / N/A Choice
  • Reading / value Text
  • Notes Paragraph

3. Condition

  • Asset condition * A - as new / B - good / C - fair / D - poor / E - failed Choice
  • Follow-on work required? * Yes / No Choice
  • Follow-on work details Paragraph
  • Photo 1 Photo
  • Photo 2 Photo
  • Additional comments Paragraph
  • Engineer name * Text
  • Engineer signature * Signature
  • Date signed * Date

Questions about this template

What is PPM?

Planned preventive maintenance: scheduled tasks carried out at set intervals to keep assets working and avoid breakdowns.

Can I load my own task steps?

Yes. Add the steps as you go, or build asset-specific versions of the form with the steps already listed.

How is follow-on work handled?

The form records whether follow-on work is needed and the details, so it can be raised as a reactive job.