Prefabricated Data Centre Form Templates
Checklists that follow a module from the factory floor to live operation: factory acceptance tests, site commissioning, integrated systems testing and the planned maintenance that follows.
Punch-list items carry an owner and a photo, so nothing is lost between the factory, the site team and the customer.
16 templates · 15 mobile · 1 online
Regulations these templates help you record
- Electricity at Work Regulations 1989 and BS 7671: electrical systems in each module must be designed, installed, inspected and tested safely.
- BS EN 50600 series: data centre facilities and infrastructures: design, availability classes and operational practice.
- Construction (Design and Management) Regulations 2015: site installation and commissioning work is construction work.
- GB F-Gas Regulation: cooling systems containing F-gas need leak checks and records kept at the intervals the charge requires.
Prefabricated Data Centres template FAQs
What is a factory acceptance test?
A FAT is a set of tests carried out on a module at the factory, usually with the customer watching, to prove it is built to the drawings and its systems work before it is shipped. Faults found are listed and cleared before dispatch.
What is the difference between FAT, SAT and IST?
A factory acceptance test is done before shipping, a site acceptance test after installation, and an integrated systems test proves all systems work together, typically by simulating a mains failure under load.
How often should a standby generator be load tested?
Many operators run a load bank test at least once a year, alongside regular off-load or on-load runs, following the manufacturer's guidance and the site's resilience requirements.
Can the customer sign off a FAT on the tablet?
Yes. The customer representative signs on the device, and a PDF of the completed checklist, with photos, can be sent to them straight away.