Quality Inspection Checklist mobile form preview
ManufacturingPrefabricated Data Centres Mobile form 3 sections · 16 questions Free

Quality Inspection Checklist template

First-off, in-process or final inspection against specification, recording measurements, results and disposition.

Use this template free

Opens in a free trial with this form ready to use.

Download printable PDF (59 KB)
Relates to

ISO 9001 (clause 8.6)

This template is provided as a starting point only. pro-Forms accepts no liability for the accuracy or suitability of its forms. Check every form with a suitably qualified person before using it in a live environment.

About this template

A quality inspection record for first-off, in-process or final inspection. Record the part, revision, batch, stage and sample size, then each characteristic or dimension with its specification, measured value, gauge ID and result.

Give an overall result and comments, with a photo, signed by the inspector.

Add a line for each characteristic on the drawing or inspection plan. Recording the measured value, not just pass or fail, lets you see when a process is drifting towards a tolerance limit.

What's on this form

Every field in the template, grouped as it appears on the phone. Required fields are marked *.

1. Inspection

  • Part number / product * Text
  • Revision Text
  • Batch / works order * Text
  • Inspection stage * First-off / In-process / Final / Goods in Choice
  • Sample size Text
  • Date * Date
  • Inspector * Text

2. Characteristics repeats as needed

  • Characteristic / dimension * Text
  • Specification / tolerance Text
  • Measured value Text
  • Gauge / instrument ID Text
  • Result * Pass / Fail Choice

3. Disposition

  • Overall result * Accept / Reject / Concession / Rework Choice
  • Comments Paragraph
  • Photo Photo
  • Inspector signature * Signature

Questions about this template

What is a first-off inspection?

An inspection of the first part produced after a set-up, to confirm the process is making parts to specification before production continues.

Why record the gauge ID?

So that, if a gauge is later found out of calibration, you can trace which inspections it was used for.

What happens if a part fails?

Raise a non-conformance report to contain the product, decide what to do with it and correct the cause.