Lockout / Tagout (LOTO) Record mobile form preview
ManufacturingFacilities Management Mobile form 4 sections · 18 questions Free

Lockout / Tagout (LOTO) Record template

Isolation record for maintenance: energy sources identified, isolated, locked, tagged, verified and released.

Use this template free

Opens in a free trial with this form ready to use.

Download printable PDF (57 KB)
Relates to

PUWER 1998 (reg. 19 isolation from energy sources)

This template is provided as a starting point only. pro-Forms accepts no liability for the accuracy or suitability of its forms. Check every form with a suitably qualified person before using it in a live environment.

About this template

An isolation record for maintenance work. Record the equipment, the work and the energy sources to be isolated, then each isolation point with its lock number, confirmation it is isolated and locked, and that zero energy has been verified.

Each person working applies a personal lock, recorded with the time on and off. The authorised person releases the isolation only when the work is complete, guards are refitted and everyone is clear.

What's on this form

Every field in the template, grouped as it appears on the phone. Required fields are marked *.

1. Isolation

  • Equipment ID * Barcode scan
  • Equipment name * Text
  • Work to be carried out * Paragraph
  • Date * Date
  • Authorised person * Text
  • Energy sources Tick boxes

2. Isolation points repeats as needed

  • Isolation point * Text
  • Lock number * Text
  • Isolated and locked * Yes / No Choice
  • Zero energy verified * Yes / No Choice

3. Personal locks repeats as needed

  • Name * Text
  • Lock number Text
  • Lock on Time
  • Lock off Time

4. Release

  • Work complete and guards refitted * Yes / No Choice
  • All personnel clear * Yes / No Choice
  • Time released Time
  • Authorised person signature * Signature

Questions about this template

Why does each person need their own lock?

So the equipment can't be re-energised until every person working on it has removed their own lock.

What does verifying zero energy mean?

Trying to start the equipment, or testing for voltage, pressure or stored energy, after isolation to prove it is safe before work starts.

What energy sources should be considered?

Electrical, hydraulic, pneumatic, mechanical (springs, flywheels, gravity), thermal and chemical energy, including anything stored in the system.