Factory Acceptance Test template
FAT checklist for a prefabricated module before dispatch: build against drawings, electrical, cooling, fire, security and documentation.
Opens in a free trial with this form ready to use.
Download printable PDF (82 KB)This template is provided as a starting point only. pro-Forms accepts no liability for the accuracy or suitability of its forms. Check every form with a suitably qualified person before using it in a live environment.
About this template
A factory acceptance test checklist for a prefabricated data centre module before it leaves the factory. Confirm the build against the drawings (dimensions, structure, finish, seals, containment, labelling and earthing), then test the systems: insulation resistance and continuity, boards, UPS, cooling, fire detection and suppression, access control and CCTV, BMS points and lighting.
Punch-list items are recorded with a category, owner and photo, and the customer representative signs off the FAT result on the tablet.
What's on this form
Every field in the template, grouped as it appears on the phone. Required fields are marked *.
1. Module
- Project * Text
- Module reference / serial * Text
- Customer Text
- Test date * Date
- Test lead * Text
- Customer witness Text
2. Build
- Dimensions to drawing * Pass / Fail / N/A Choice
- Structure and welds inspected * Pass / Fail / N/A Choice
- Paint / finish complete * Pass / Fail / N/A Choice
- Doors, seals and locks * Pass / Fail / N/A Choice
- Cable containment complete * Pass / Fail / N/A Choice
- Labelling complete * Pass / Fail / N/A Choice
- Rack positions and earthing * Pass / Fail / N/A Choice
3. Systems
- Insulation resistance tests passed * Pass / Fail / N/A Choice
- Earth continuity * Pass / Fail / N/A Choice
- Main and distribution boards energised * Pass / Fail / N/A Choice
- UPS functional test * Pass / Fail / N/A Choice
- Cooling units run and controlled * Pass / Fail / N/A Choice
- Fire detection and suppression functional * Pass / Fail / N/A Choice
- Access control and CCTV functional * Pass / Fail / N/A Choice
- BMS / monitoring points verified * Pass / Fail / N/A Choice
- Lighting and emergency lighting * Pass / Fail / N/A Choice
4. Punch list repeats as needed
- Item * Paragraph
- Category * A - before dispatch / B - before handover / C - observation Choice
- Owner Text
- Photo Photo
5. Sign-off
- FAT result * Accepted / Accepted with punch list / Rejected Choice
- Customer representative Text
- Customer signature Signature
- Additional comments Paragraph
- Test lead name * Text
- Test lead signature * Signature
- Date signed * Date
Questions about this template
Who attends a FAT?
The manufacturer's test lead and engineers, and usually a customer representative or their consultant, who witnesses the tests and signs the result.
What happens to punch-list items?
Each item has an owner and a category, such as must fix before dispatch or fix on site, so they can be tracked to completion.
Can the FAT be repeated?
Yes. Complete a new record for a re-test; the history shows how the result changed.