Scaffold Inspection Report template
Seven-day and post-alteration scaffold inspection covering foundations, ties, boards, guardrails, toe boards and access.
Opens in a free trial with this form ready to use.
Download printable PDF (75 KB)Work at Height Regulations 2005 (Schedule 7); NASC TG20
This template is provided as a starting point only. pro-Forms accepts no liability for the accuracy or suitability of its forms. Check every form with a suitably qualified person before using it in a live environment.
About this template
A scaffold inspection report covering the checks set out in the Work at Height Regulations and NASC TG20 guidance: base plates and sole boards, standards, ledgers and transoms, bracing, ties, boards, guardrails, toe boards, brick guards and netting, ladder access, loading and the scaffold tag.
Record the reason for the inspection, whether the scaffold is safe to use and any defects with photos. The report is dated and signed by the competent person who carried it out.
What's on this form
Every field in the template, grouped as it appears on the phone. Required fields are marked *.
1. Scaffold
- Site name * Text
- Site address Paragraph
- Date * Date
- Time Time
- Scaffold location / description * Text
- Scaffold tag number Text
- Reason for inspection * Before first use / 7-day inspection / After alteration / After adverse weather Choice
- Inspector * Text
2. Checklist
- Base plates and sole boards adequate * Satisfactory / Unsatisfactory / N/A Choice
- Standards plumb and undamaged * Satisfactory / Unsatisfactory / N/A Choice
- Ledgers and transoms secure * Satisfactory / Unsatisfactory / N/A Choice
- Bracing in place * Satisfactory / Unsatisfactory / N/A Choice
- Ties secure and at correct spacing * Satisfactory / Unsatisfactory / N/A Choice
- Boards complete and secure, no trip hazards * Satisfactory / Unsatisfactory / N/A Choice
- Guardrails at correct height * Satisfactory / Unsatisfactory / N/A Choice
- Toe boards fitted * Satisfactory / Unsatisfactory / N/A Choice
- Brick guards / netting where required * Satisfactory / Unsatisfactory / N/A Choice
- Ladder access secure * Satisfactory / Unsatisfactory / N/A Choice
- Loading within limits * Satisfactory / Unsatisfactory / N/A Choice
- Scaffold tag displayed and current * Satisfactory / Unsatisfactory / N/A Choice
3. Result
- Is the scaffold safe to use? * Yes / No Choice
- Defects found and action taken Paragraph
- Photo 1 Photo
- Photo 2 Photo
- Additional comments Paragraph
- Inspector name * Text
- Inspector signature * Signature
- Date signed * Date
Questions about this template
How often must a scaffold be inspected?
Before first use, at least every 7 days while in use, and after any event likely to have affected its stability, such as high winds or alterations.
Who can inspect a scaffold?
A competent person with the training and experience to recognise defects, typically a CISRS-trained scaffold inspector for anything beyond a basic tower.
How long must the report be kept?
On site until the construction work is finished, then for three months. The report must be completed before the end of the working day and given to the person in control of the work within 24 hours.