Traffic Management Set-Up Checklist mobile form preview
Road SweepingConstructionLandscaping & Grounds Maintenance Mobile form 3 sections · 22 questions Free

Traffic Management Set-Up Checklist template

Checks before, during and after working on the highway: signage layout, cones, lighting, safety zones and removal.

Use this template free

Opens in a free trial with this form ready to use.

Download printable PDF (70 KB)
Relates to

Safety at Street Works and Road Works Code of Practice (Red Book); Chapter 8

This template is provided as a starting point only. pro-Forms accepts no liability for the accuracy or suitability of its forms. Check every form with a suitably qualified person before using it in a live environment.

About this template

Checks before, during and after work on the highway. Record the location, permit reference, road speed and layout, then confirm signs, cones and tapers, safety zones, lighting, the pedestrian route, beacons and hi-vis, with photos of the set-up.

On completion, record when the equipment was removed and that the road was fully reopened, signed by the supervisor.

Complete the set-up section before work starts and the removal section before leaving, so the record shows the highway was safe for the whole time you were there.

What's on this form

Every field in the template, grouped as it appears on the phone. Required fields are marked *.

1. Location

  • Road / location * Text
  • Date * Date
  • Supervisor * Text
  • Permit / licence reference Text
  • Road speed limit * 20 / 30 / 40 / 50 / 60 / 70 Choice
  • Layout type * Mobile works / Lane closure / Footway works / Convoy / Stop / go Choice

2. Set-up

  • Signs placed per layout and visible * Yes / No / N/A Choice
  • Cones and taper correct * Yes / No / N/A Choice
  • Safety zones maintained * Yes / No / N/A Choice
  • Lighting where required * Yes / No / N/A Choice
  • Pedestrian route maintained and accessible * Yes / No / N/A Choice
  • Vehicle beacons on * Yes / No / N/A Choice
  • Operatives in correct hi-vis * Yes / No / N/A Choice
  • Set-up photographed * Yes / No / N/A Choice
  • Set-up photo 1 Photo
  • Set-up photo 2 Photo

3. Removal

  • Time removed Time
  • All equipment removed and road reopened * Yes / No Choice
  • Additional comments Paragraph
  • Supervisor name * Text
  • Supervisor signature * Signature
  • Date signed * Date

Questions about this template

What is the Red Book?

The Safety at Street Works and Road Works Code of Practice, which sets out how to sign, light and guard works on the highway.

Why photograph the set-up?

It is evidence that the layout was correct when work started, which protects you if there is an incident or complaint.

Do pedestrians need a route?

Yes. A safe, accessible route must be kept for pedestrians, including people using wheelchairs or pushchairs.