Electrical Installation Condition Report (EICR) Checklist template
Site checklist for periodic inspection and testing: installation details, supply characteristics, inspection schedule, circuit test results and observations coded C1, C2, C3 or FI.
Opens in a free trial with this form ready to use.
Download printable PDF (100 KB)BS 7671 (18th Edition) Chapter 65; Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020
This template is provided as a starting point only. pro-Forms accepts no liability for the accuracy or suitability of its forms. Check every form with a suitably qualified person before using it in a live environment.
About this template
A site checklist for periodic inspection and testing, following the layout of the BS 7671 model condition report. Record the client, purpose, extent and limitations, the supply characteristics and earthing arrangement, then the inspection schedule: intake equipment, consumer unit, RCD protection, earthing and bonding, wiring, accessories, special locations, surge protection and labelling.
Add circuit-by-circuit test results and each observation with its classification (C1, C2, C3 or FI) and a photo, then the overall condition and recommended next inspection date.
What's on this form
Every field in the template, grouped as it appears on the phone. Required fields are marked *.
1. Details
- Client name * Text
- Installation address * Paragraph
- Purpose of report * Change of occupancy / Landlord requirement / Periodic / Insurance / Mortgage / Other Choice
- Premises type * Domestic / Commercial / Industrial / Other Choice
- Estimated age of wiring (years) Text
- Date of inspection * Date
- Extent of installation covered Paragraph
- Agreed limitations Paragraph
2. Supply
- Earthing arrangement * TN-C-S / TN-S / TT / IT Choice
- Supply * Single phase / Three phase Choice
- Nominal voltage (V) Text
- Ze external loop impedance (ohms) * Text
- Prospective fault current (kA) * Text
- Main switch rating (A) Text
- Main earthing conductor size (mm²) Text
- Main bonding conductor size (mm²) Text
- Bonding present to Water / Gas / Oil / Structural steel / Lightning protection / Other Tick boxes
3. Inspection schedule
- Intake equipment condition * OK / C1 / C2 / C3 / FI / N/A Choice
- Consumer unit / distribution board condition * OK / C1 / C2 / C3 / FI / N/A Choice
- Presence of RCD protection where required * OK / C1 / C2 / C3 / FI / N/A Choice
- Earthing and bonding * OK / C1 / C2 / C3 / FI / N/A Choice
- Wiring systems and cable condition * OK / C1 / C2 / C3 / FI / N/A Choice
- Accessories and switchgear * OK / C1 / C2 / C3 / FI / N/A Choice
- Special locations (bath / shower) * OK / C1 / C2 / C3 / FI / N/A Choice
- SPD (surge protection) * OK / C1 / C2 / C3 / FI / N/A Choice
- Labelling and circuit charts * OK / C1 / C2 / C3 / FI / N/A Choice
4. Circuit test results repeats as needed
- Circuit number * Text
- Circuit description * Text
- Protective device type and rating Text
- R1+R2 (ohms) Text
- Insulation resistance (megohms) Text
- Polarity correct Yes / No / N/A Choice
- Zs measured (ohms) Text
- RCD trip time (ms) Text
- RCD test button operates Yes / No / N/A Choice
5. Observations repeats as needed
- Observation * Paragraph
- Classification * C1 - danger present / C2 - potentially dangerous / C3 - improvement recommended / FI - further investigation Choice
- Location / circuit Text
- Photo Photo
6. Summary
- Overall condition * Satisfactory / Unsatisfactory Choice
- Recommended next inspection date * Date
- Additional comments Paragraph
- Inspector name * Text
- Inspector signature * Signature
- Date signed * Date
- Customer name (print) Text
- Customer signature Signature
Questions about this template
What do the observation codes mean?
C1: danger present, immediate action required. C2: potentially dangerous, urgent remedial action required. C3: improvement recommended. FI: further investigation required without delay.
When is a report "unsatisfactory"?
If any C1, C2 or FI observation is recorded, the overall condition is unsatisfactory.
Which version of BS 7671 applies?
BS 7671:2018+A4:2026, published in April 2026. The previous version was withdrawn in October 2026.