Electrical Form Templates

Inspection and test records for electrical contractors: EICR site checklists with circuit-by-circuit results, minor works records, PAT testing and job sheets.

Enter readings as you test, attach photos of observations and send the customer a report the same day.

See pro-Forms for Electrical →

16 templates · 15 mobile · 1 online

Electrical starter set: the 4 templates marked below are added to your account automatically when you start a free trial and choose Electrical as your industry.
Starter set Electrical Installation Condition Report (EICR) Checklist template preview Mobile form · 48 questions Electrical Installation Condition Report (EICR) Checklist Site checklist for periodic inspection and testing: installation details, supply characteristics, inspection schedule, circuit test results and observations coded C1, C2, C3 or FI. Starter set Minor Electrical Installation Works Record template preview Mobile form · 25 questions Minor Electrical Installation Works Record Records the details of minor electrical works, such as an added socket or replaced circuit accessory, including circuit details and test results. Starter set Portable Appliance Testing (PAT) Record template preview Mobile form · 22 questions Portable Appliance Testing (PAT) Record Appliance-by-appliance PAT record: ID, class, visual inspection, earth continuity, insulation resistance and result. Starter set Job Sheet template preview Mobile form · 25 questions Job Sheet Record a site visit: work carried out, parts and materials used, time on site, photos and customer sign-off. Toolbox Talk Record template preview Mobile form · 12 questions Toolbox Talk Record Record the topic, key points and attendance of a toolbox talk, with each attendee signing to confirm they understood. Module Commissioning Checklist template preview Mobile form · 30 questions Module Commissioning Checklist Site commissioning of an installed data centre module, from mechanical completion through integrated systems testing. Generator Load Bank Test template preview Mobile form · 39 questions Generator Load Bank Test Standby generator test record: pre-start checks, start time, load steps, readings and post-test condition. EV Charger Installation Checklist template preview Mobile form · 41 questions EV Charger Installation Checklist Survey-to-handover checklist for an EV charge point: supply, earthing arrangement, protection, location, test results and customer handover. Equipment Sign-Out Sheet template preview Mobile form · 14 questions Equipment Sign-Out Sheet Track tools and equipment leaving the store: item, who has it, condition out and in, and return date. Vehicle Daily Walkaround Check template preview Mobile form · 21 questions Vehicle Daily Walkaround Check Driver's daily walkaround of a van or car: tyres, lights, mirrors, fluids, bodywork, load security and defects. UPS Maintenance Report template preview Mobile form · 36 questions UPS Maintenance Report Preventive maintenance of a UPS: alarms, batteries, capacitors, fans, bypass and load readings. Emergency Lighting Test Record template preview Mobile form · 17 questions Emergency Lighting Test Record Record monthly functional flick tests and annual 3-hour duration tests of emergency lighting fittings. Quote Request Form template preview Online form · 12 questions Quote Request Form Customer request for a quotation: contact details, site address, work required, timescale, budget and photos. Fire Alarm Service Report template preview Mobile form · 35 questions Fire Alarm Service Report Periodic inspection and service of a fire detection and alarm system: panel, batteries, detectors, call points and sounders. Safe Isolation Checklist template preview Mobile form · 19 questions Safe Isolation Checklist Step-by-step safe isolation record: identify, isolate, lock off, prove the tester, test dead, re-prove and display warnings. Solar PV Inspection and Maintenance template preview Mobile form · 36 questions Solar PV Inspection and Maintenance Periodic inspection of a solar PV system: array condition, DC isolators, inverter, string readings and generation.

Regulations these templates help you record

  • Electricity at Work Regulations 1989: electrical systems must be constructed and maintained to prevent danger, so far as reasonably practicable.
  • BS 7671 (IET Wiring Regulations): the national standard for electrical installations, including periodic inspection and testing. The current version is BS 7671:2018+A4:2026, published in April 2026; the previous version was withdrawn in October 2026.
  • Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020: landlords must have the installation inspected and tested at least every five years and give tenants a copy of the report.
  • IET Code of Practice for In-service Inspection and Testing of Electrical Equipment: guidance on PAT inspection and testing frequencies and methods.

Electrical template FAQs

Is the EICR template an official certificate?

It is a site checklist that follows the BS 7671 model report layout, for capturing the inspection schedule, test results and observations on site. If your competent person scheme requires its own report format, use this to collect the results and transfer them.

What do C1, C2, C3 and FI mean?

C1 means danger present and immediate action is needed. C2 means potentially dangerous, with urgent remedial action required. C3 means improvement recommended. FI means further investigation is needed without delay.

How often does an EICR need doing?

For privately rented homes in England, at least every five years. For other premises the interval depends on the type of installation and its use, and is recommended by the inspector in the report.

Is PAT testing a legal requirement?

The law requires electrical equipment to be maintained to prevent danger; it doesn't set PAT intervals. The IET Code of Practice suggests frequencies based on the type of equipment and environment.

Other industries