EV Charger Installation Checklist mobile form preview
ElectricalEnergy & Environmental Mobile form 4 sections · 40 questions Free

EV Charger Installation Checklist template

Survey-to-handover checklist for an EV charge point: supply, earthing arrangement, protection, location, test results and customer handover.

Use this template free

Opens in a free trial with this form ready to use.

Download printable PDF (90 KB)
Relates to

BS 7671 Section 722; IET Code of Practice for EV Charging Equipment Installation

This template is provided as a starting point only. pro-Forms accepts no liability for the accuracy or suitability of its forms. Check every form with a suitably qualified person before using it in a live environment.

About this template

A survey-to-handover checklist for installing an EV charge point. Record the charger, its output and the supply, then the design checks: maximum demand, DNO notification, earthing arrangement and PME protection, RCD protection, a dedicated circuit, cable sizing, load management and mounting position.

Test results cover Zs, insulation resistance, RCD trip time and earth electrode resistance, plus a test charge and photos. The handover confirms the app and account are set up, operation explained and the certificate issued.

What's on this form

Every field in the template, grouped as it appears on the phone. Required fields are marked *.

1. Installation

  • Customer name * Text
  • Site name Text
  • Site address Paragraph
  • Job reference Text
  • Date of visit * Date
  • Time on site Time
  • Time off site Time
  • Charge point make Text
  • Charge point model Text
  • Charge point serial number Text
  • Charge point ID / barcode Barcode scan
  • Charge point location Text
  • Rated output (kW) * Text
  • Supply * Single phase / Three phase Choice

2. Design checks

  • Maximum demand assessment completed * Yes / No / N/A Choice
  • DNO notification / application made * Yes / No / N/A Choice
  • Earthing arrangement suitable (PME protection device or earth electrode) * Yes / No / N/A Choice
  • RCD protection (Type A + 6mA DC detection or Type B) * Yes / No / N/A Choice
  • Dedicated circuit * Yes / No / N/A Choice
  • Cable sized for load and volt drop * Yes / No / N/A Choice
  • Load management configured * Yes / No / N/A Choice
  • Mounting position suitable and protected from impact * Yes / No / N/A Choice
  • Smart charging regulations compliance * Yes / No / N/A Choice

3. Tests

  • Zs (ohms) * Text
  • Insulation resistance (megohms) * Text
  • RCD trip time (ms) Text
  • Earth electrode resistance (ohms) Text
  • Test charge completed * Pass / Fail / N/A Choice
  • Photo 1 Photo
  • Photo 2 Photo
  • Photo 3 Photo

4. Handover

  • App and account set up with customer * Yes / No / N/A Choice
  • Operation explained * Yes / No / N/A Choice
  • Certificate issued * Yes / No / N/A Choice
  • Additional comments Paragraph
  • Installer name * Text
  • Installer signature * Signature
  • Date signed * Date
  • Customer name (print) Text
  • Customer signature Signature

Questions about this template

What RCD protection does a charge point need?

BS 7671 Section 722 requires RCD protection that copes with DC fault currents: a Type B RCD, or a Type A with a 6mA DC detection device, unless the charger provides it.

Does the DNO need to know about a charge point?

Yes. Charge points must be notified to the distribution network operator, and larger installations may need approval before connection.

Why is the earthing arrangement important?

On a PME supply, an open PEN fault can make the car's body live. Section 722 sets out protection measures, such as an earth electrode or an open-PEN protection device.